Technical figures produced during the modern reconstruction of the HARE Irrigation Project.
The archive brings together Rational Method peak-discharge screening, HEC-HMS flood hydrology,
SWAT watershed modelling, CROPWAT irrigation-demand analysis, HEC-RAS river hydraulics,
rainfall IDF analysis, canal hydraulic structures and diversion headworks in one visual engineering record.
36 gallery resourcesUse the model filters or search by topic. Click any figure to enlarge it.
Featured results
Current HARE modelling highlights
Explore the corrected 70.9 mm HEC-RAS simulation alongside hydrological research highlights.
All of these figures are already part of the full technical gallery below.
HARE Weir combined land-use, slope and soil GIS analysis: 26 raster combinations, soil Group C, and a preliminary area-weighted runoff coefficient of C = 0.318006. Includes the Q = CIA workflow and provisional 25-year and 50-year peak-flow comparisons. Coefficient assumptions and updated IDF intensity still require verification. Team1995 | harewater.org.
Preliminary HARE headworks design infographic for the 195.2 m³/s flood, illustrating the ogee crest, sediment-flushing sluice, canal head regulator, stilling basin and downstream protection. Dimensions remain subject to hydraulic and foundation verification.
Updated HARE rainfall-on-grid 2D simulation, plan rain_70_9_mm: 73,987 cells, Diffusion Wave solver, approximately 195 m³/s upstream and 240 m³/s downstream, and 0.002166% numerical volume-accounting error. Illustrative infographic; consult the HEC-RAS outputs for exact plotted values.
Combined technical infographic illustrating the 70.9 mm HARE simulation, mapped flood response, and upstream/downstream boundary hydrographs. Hydrograph peaks are approximately 195 m³/s upstream and 240 m³/s downstream.
Illustrated 2D HARE flood-mapping summary with water-surface elevation, maximum velocity and maximum depth panels. The source HEC-RAS rasters remain authoritative for map measurements.
HARE IDF Curves — Preliminary Rainfall Intensities
HARE watershed-average intensity–duration–frequency curves from NASA IMERG V07 rainfall, 2000–2025. Seven durations and six return periods. Preliminary research estimates; not an approved design standard.
HARE IDF Curves — Preliminary Rainfall Intensities
HARE watershed-average intensity–duration–frequency curves from NASA IMERG V07 rainfall, 2000–2025. Seven durations and six return periods. Preliminary research estimates; not an approved design standard.
HARE Weir combined land-use, slope and soil GIS analysis: 26 raster combinations, soil Group C, and a preliminary area-weighted runoff coefficient of C = 0.318006. Includes the Q = CIA workflow and provisional 25-year and 50-year peak-flow comparisons. Coefficient assumptions and updated IDF intensity still require verification. Team1995 | harewater.org.
Hare Weir Catchment Land Use and Land Cover Summary
ArcMap 10 m land-cover raster classification showing trees, crops, built-up land, bare ground, cloud-covered pixels and rangeland. Raster total 16,495.33 ha; the GIS-delineated weir catchment is 16,388.67 ha. Boundary discrepancy and unclassified clouds are documented pending verification. Team1995 | harewater.org.
Updated HARE rainfall-on-grid 2D simulation, plan rain_70_9_mm: 73,987 cells, Diffusion Wave solver, approximately 195 m³/s upstream and 240 m³/s downstream, and 0.002166% numerical volume-accounting error. Illustrative infographic; consult the HEC-RAS outputs for exact plotted values.
Combined technical infographic illustrating the 70.9 mm HARE simulation, mapped flood response, and upstream/downstream boundary hydrographs. Hydrograph peaks are approximately 195 m³/s upstream and 240 m³/s downstream.
Illustrated 2D HARE flood-mapping summary with water-surface elevation, maximum velocity and maximum depth panels. The source HEC-RAS rasters remain authoritative for map measurements.
Archived earlier HEC-RAS 2D run (plan ups_0.045G), retained for model-development history. The updated 70.9 mm rainfall-on-grid simulation is featured above.
Approximate reconstruction of the HARE diversion headworks showing river-bed level, weir crest, canal entrance, normal canal water level, low-level sediment excluder and downstream canal drop.
Conceptual longitudinal section of a HARE irrigation-canal drop showing the upstream check gate, overfall, downstream stilling apron, energy-dissipation blocks and riprap scour protection. Prepared for the HARE Irrigation Project — Team1995 | harewater.org.
Conceptual three-outlet HARE irrigation division box with an open upstream entrance, left and right gated outlets, a full-width downstream slide gate, flow distribution, transition, erosion protection and the hydraulic head difference (Delta H). Prepared for the HARE Irrigation Project — Team1995 | harewater.org.
Preliminary HARE headworks design infographic for the 195.2 m³/s flood, illustrating the ogee crest, sediment-flushing sluice, canal head regulator, stilling basin and downstream protection. Dimensions remain subject to hydraulic and foundation verification.