Model Gallery

Technical figures produced during the modern reconstruction of the HARE Irrigation Project. The archive brings together Rational Method peak-discharge screening, HEC-HMS flood hydrology, SWAT watershed modelling, CROPWAT irrigation-demand analysis, HEC-RAS river hydraulics, rainfall IDF analysis, canal hydraulic structures and diversion headworks in one visual engineering record.

36 gallery resources Use the model filters or search by topic. Click any figure to enlarge it.
New: HARE Rainfall IDF Calculator

Explore preliminary watershed-average rainfall intensities for seven storm durations and six return periods. Research estimates, not an official design standard.

Open IDF calculator →
Featured results

Current HARE modelling highlights

Explore the corrected 70.9 mm HEC-RAS simulation alongside hydrological research highlights. All of these figures are already part of the full technical gallery below.

GIS-Based Weighted Runoff Coefficient — Rational Method (Q = CIA)
Rational Method

GIS-Based Weighted Runoff Coefficient — Rational Method (Q = CIA)

HARE Weir combined land-use, slope and soil GIS analysis: 26 raster combinations, soil Group C, and a preliminary area-weighted runoff coefficient of C = 0.318006. Includes the Q = CIA workflow and provisional 25-year and 50-year peak-flow comparisons. Coefficient assumptions and updated IDF intensity still require verification. Team1995 | harewater.org.

Open Rational Method Page
HARE Ogee Diversion Weir — Q50 = 195.2 m³/s
Head Works

HARE Ogee Diversion Weir — Q50 = 195.2 m³/s

Preliminary HARE headworks design infographic for the 195.2 m³/s flood, illustrating the ogee crest, sediment-flushing sluice, canal head regulator, stilling basin and downstream protection. Dimensions remain subject to hydraulic and foundation verification.

Open Headworks Design
HEC-RAS 70.9 mm — Updated Simulation Summary
HEC-RAS

HEC-RAS 70.9 mm — Updated Simulation Summary

Updated HARE rainfall-on-grid 2D simulation, plan rain_70_9_mm: 73,987 cells, Diffusion Wave solver, approximately 195 m³/s upstream and 240 m³/s downstream, and 0.002166% numerical volume-accounting error. Illustrative infographic; consult the HEC-RAS outputs for exact plotted values.

Open section
HEC-RAS 70.9 mm — Flood Maps and Hydrographs
HEC-RAS

HEC-RAS 70.9 mm — Flood Maps and Hydrographs

Combined technical infographic illustrating the 70.9 mm HARE simulation, mapped flood response, and upstream/downstream boundary hydrographs. Hydrograph peaks are approximately 195 m³/s upstream and 240 m³/s downstream.

Open section
HEC-RAS 70.9 mm — 2D Flood Mapping Summary
HEC-RAS

HEC-RAS 70.9 mm — 2D Flood Mapping Summary

Illustrated 2D HARE flood-mapping summary with water-surface elevation, maximum velocity and maximum depth panels. The source HEC-RAS rasters remain authoritative for map measurements.

Open section
HARE IDF Curves — Preliminary Rainfall Intensities
IDF

HARE IDF Curves — Preliminary Rainfall Intensities

HARE watershed-average intensity–duration–frequency curves from NASA IMERG V07 rainfall, 2000–2025. Seven durations and six return periods. Preliminary research estimates; not an approved design standard.

Open IDF Calculator
25- and 50-Year Flood Hydrographs
HEC-HMS

25- and 50-Year Flood Hydrographs

Comparison of HEC-HMS outlet hydrographs for the 25-year and 50-year design events.

Open section
Explore the modelling workflow

Swipe sideways to browse modelling groups →

IDF analysis HARE IDF Curves — Preliminary Rainfall Intensities
IDF

HARE IDF Curves — Preliminary Rainfall Intensities

HARE watershed-average intensity–duration–frequency curves from NASA IMERG V07 rainfall, 2000–2025. Seven durations and six return periods. Preliminary research estimates; not an approved design standard.

Open IDF Calculator
Runoff analysis GIS-Based Weighted Runoff Coefficient — Rational Method (Q = CIA)
Rational Method

GIS-Based Weighted Runoff Coefficient — Rational Method (Q = CIA)

HARE Weir combined land-use, slope and soil GIS analysis: 26 raster combinations, soil Group C, and a preliminary area-weighted runoff coefficient of C = 0.318006. Includes the Q = CIA workflow and provisional 25-year and 50-year peak-flow comparisons. Coefficient assumptions and updated IDF intensity still require verification. Team1995 | harewater.org.

Open Rational Method Page
Design input Rainfall Time Series
HEC-HMS

Rainfall Time Series

CHIRPS daily watershed-average rainfall time series for the Hare catchment, 1981-2025.

Open section
Model result Annual Maxima Plot
HEC-HMS

Annual Maxima Plot

Annual maximum daily catchment-average rainfall series used for rainfall-frequency analysis.

Open section
Design input Design Hyetograph
HEC-HMS

Design Hyetograph

HEC-HMS 24-hour design storm represented as 15-minute incremental rainfall.

Open section
Hydrology concept Hyetograph–Hydrograph Catchment Response
HEC-HMS

Hyetograph–Hydrograph Catchment Response

Conceptual infographic explaining effective rainfall, rainfall-excess centroid, basin lag, time to peak, peak discharge, runoff volume and catchment response.

Open section
Model setup HEC-HMS Basin Model
HEC-HMS

HEC-HMS Basin Model

Schematic representation of the Hare HEC-HMS basin model and hydrological connectivity.

Open section
Model result 25- and 50-Year Flood Hydrographs
HEC-HMS

25- and 50-Year Flood Hydrographs

Comparison of HEC-HMS outlet hydrographs for the 25-year and 50-year design events.

Open section
Model result 50-Year Simulation Results
HEC-HMS

50-Year Simulation Results

Technical summary of the 50-year HEC-HMS simulation and design-flood results.

Open section
Model result 50-Year Outlet Hydrograph
HEC-HMS

50-Year Outlet Hydrograph

Detailed outlet flood hydrograph for the 50-year HEC-HMS design event.

Open section
Model result 50-Year Peak Flow Summary
HEC-HMS

50-Year Peak Flow Summary

Summary of modelled peak flow and key HEC-HMS flood-design values.

Open section
Model result Runoff Depth and Volume
HEC-HMS

Runoff Depth and Volume

HEC-HMS 50-year runoff depth and flood-volume summary for the Hare catchment.

Open section
Model setup Subbasin Contributions and Routed Flow
HEC-HMS

Subbasin Contributions and Routed Flow

Contribution of individual subbasins and routed flow within the 50-year HEC-HMS simulation.

Open section
Design input 50-Year SCS Type II Design Storm
HEC-HMS

50-Year SCS Type II Design Storm

SCS Type II design-storm hyetograph used for the 50-year HEC-HMS simulation.

Open section
Model result Hare Weir Catchment Land Use and Land Cover Summary
SWAT

Hare Weir Catchment Land Use and Land Cover Summary

ArcMap 10 m land-cover raster classification showing trees, crops, built-up land, bare ground, cloud-covered pixels and rangeland. Raster total 16,495.33 ha; the GIS-delineated weir catchment is 16,388.67 ha. Boundary discrepancy and unclassified clouds are documented pending verification. Team1995 | harewater.org.

Open section
Model setup SWAT Watershed Delineation
SWAT

SWAT Watershed Delineation

DEM-derived Hare watershed, drainage network and outlet configuration prepared for the SWAT model.

Open section
Model setup SWAT Soil and Slope Overview
SWAT

SWAT Soil and Slope Overview

Combined infographic of the actual SWAT soil input and DEM-derived slope classes used for watershed and HRU analysis.

Open section
Model result SWAT Hydrology Summary
SWAT

SWAT Hydrology Summary

Simulation water-balance summary including precipitation, PET, evapotranspiration, surface runoff, lateral flow and groundwater return flow.

Open section
Model result SWAT Sediment Summary
SWAT

SWAT Sediment Summary

Summary of simulated sediment generation, transport and watershed sediment response from the SWAT reconstruction.

Open section
Model result Sedimentation at Hare Weir
SWAT

Sedimentation at Hare Weir

Project-focused interpretation of SWAT sediment results at the Hare diversion weir and their relevance to operation and maintenance.

Open section
Water-demand analysis CROPWAT Climate Table
CROPWAT

CROPWAT Climate Table

FAO historical climate data used for reference evapotranspiration and crop-water analysis.

Open section
Water-demand analysis CROPWAT vs SWAT Comparison
CROPWAT

CROPWAT vs SWAT Comparison

Comparison of rainfall and evapotranspiration indicators between CROPWAT climate data and SWAT.

Open section
Water-demand analysis CROPWAT CWR Summary
CROPWAT

CROPWAT CWR Summary

Summary of crop-water-requirement methodology and irrigation-demand workflow.

Open section
Hydraulic result HEC-RAS 70.9 mm — Updated Simulation Summary
HEC-RAS

HEC-RAS 70.9 mm — Updated Simulation Summary

Updated HARE rainfall-on-grid 2D simulation, plan rain_70_9_mm: 73,987 cells, Diffusion Wave solver, approximately 195 m³/s upstream and 240 m³/s downstream, and 0.002166% numerical volume-accounting error. Illustrative infographic; consult the HEC-RAS outputs for exact plotted values.

Open section
Hydraulic result HEC-RAS 70.9 mm — Flood Maps and Hydrographs
HEC-RAS

HEC-RAS 70.9 mm — Flood Maps and Hydrographs

Combined technical infographic illustrating the 70.9 mm HARE simulation, mapped flood response, and upstream/downstream boundary hydrographs. Hydrograph peaks are approximately 195 m³/s upstream and 240 m³/s downstream.

Open section
Hydraulic result HEC-RAS 70.9 mm — 2D Flood Mapping Summary
HEC-RAS

HEC-RAS 70.9 mm — 2D Flood Mapping Summary

Illustrated 2D HARE flood-mapping summary with water-surface elevation, maximum velocity and maximum depth panels. The source HEC-RAS rasters remain authoritative for map measurements.

Open section
Model setup Land Cover and Manning Roughness
HEC-RAS

Land Cover and Manning Roughness

Land-cover interpretation and hydraulic roughness used across the HEC-RAS 2D computational domain.

Open section
Design input 50-Year Design Rainfall Hyetograph
HEC-RAS

50-Year Design Rainfall Hyetograph

Development of the 50-year synthetic design rainfall used in the HARE hydrological and hydraulic modelling workflow.

Open section
Design input 50-Year Design Inflow Hydrograph
HEC-RAS

50-Year Design Inflow Hydrograph

HEC-HMS 50-year runoff hydrograph transferred to HEC-RAS as the principal upstream hydraulic boundary condition.

Open section
Hydraulic result Earlier 50-Year HEC-RAS Simulation (Archive)
HEC-RAS

Earlier 50-Year HEC-RAS Simulation (Archive)

Archived earlier HEC-RAS 2D run (plan ups_0.045G), retained for model-development history. The updated 70.9 mm rainfall-on-grid simulation is featured above.

Open section
Hydraulic result 50-Year Maximum Flow Velocity
HEC-RAS

50-Year Maximum Flow Velocity

Maximum simulated velocity distribution for the 50-year event, showing the principal high-energy river and tributary flow paths.

Open section
Hydraulic result 50-Year Maximum Water Depth
HEC-RAS

50-Year Maximum Water Depth

Maximum simulated water-depth distribution for the 50-year event across the HARE 2D hydraulic domain.

Open section
Reconstruction Reconstructed Weir and Canal-Entrance Levels
HEC-RAS

Reconstructed Weir and Canal-Entrance Levels

Approximate reconstruction of the HARE diversion headworks showing river-bed level, weir crest, canal entrance, normal canal water level, low-level sediment excluder and downstream canal drop.

Open section
Hydraulic structure Typical Canal Drop Structure and Stilling Basin
Canal Design

Typical Canal Drop Structure and Stilling Basin

Conceptual longitudinal section of a HARE irrigation-canal drop showing the upstream check gate, overfall, downstream stilling apron, energy-dissipation blocks and riprap scour protection. Prepared for the HARE Irrigation Project — Team1995 | harewater.org.

Open section
Hydraulic structure Typical Gated Field or Tertiary Turnout
Canal Design

Typical Gated Field or Tertiary Turnout

Conceptual three-outlet HARE irrigation division box with an open upstream entrance, left and right gated outlets, a full-width downstream slide gate, flow distribution, transition, erosion protection and the hydraulic head difference (Delta H). Prepared for the HARE Irrigation Project — Team1995 | harewater.org.

Open section
Preliminary headworks design HARE Ogee Diversion Weir — Q50 = 195.2 m³/s
Head Works

HARE Ogee Diversion Weir — Q50 = 195.2 m³/s

Preliminary HARE headworks design infographic for the 195.2 m³/s flood, illustrating the ogee crest, sediment-flushing sluice, canal head regulator, stilling basin and downstream protection. Dimensions remain subject to hydraulic and foundation verification.

Open Headworks Design
No published figures match this filter or search.
100%
View full image ↗
HARE Irrigation Project

Preserving the 1995 engineering study and extending it through modern hydrology, GIS, DEM analysis, rainfall-runoff modelling and watershed simulation.

HARE HomeProjectBookMaps & DEMModels
© 2026 HARE Irrigation Project·Engineering archive & technical reassessment